Yingjie Qin, Lilan Wu, Jiehui Zheng, 等. Optimal operation of integrated energy systems subject to coupled demand constraints of electricity and natural gas[J]. 中国电机工程学会电力与能源系统学报(英文), 2020,6(2):444-457.
Yingjie Qin, Lilan Wu, Jiehui Zheng, et al. Optimal operation of integrated energy systems subject to coupled demand constraints of electricity and natural gas[J]. CSEE Journal of Power and Energy Systems, 2020, 6(2): 444-457.
Yingjie Qin, Lilan Wu, Jiehui Zheng, 等. Optimal operation of integrated energy systems subject to coupled demand constraints of electricity and natural gas[J]. 中国电机工程学会电力与能源系统学报(英文), 2020,6(2):444-457. DOI: 10.17775/CSEEJPES.2018.00640.
Yingjie Qin, Lilan Wu, Jiehui Zheng, et al. Optimal operation of integrated energy systems subject to coupled demand constraints of electricity and natural gas[J]. CSEE Journal of Power and Energy Systems, 2020, 6(2): 444-457. DOI: 10.17775/CSEEJPES.2018.00640.
Optimal operation of integrated energy systems subject to coupled demand constraints of electricity and natural gas
This paper proposes a hybrid multi-objective optimization and game-theoretic approach (HMOGTA) to achieve the optimal operation of integrated energy systems (IESs) consisting of electricity and natural gas (E&G) utility networks
multiple distributed energy stations (DESs)
and multiple energy users (EUs). The HMOGTA aims to solve the coordinated operation strategy of the electricity and natural gas networks considering the demand characteristics of DESs and EUs. In the HMOGTA
a hierarchical Stackelberg game model is developed for generating equilibrium strategies of DESs and EUs in each district energy network (DEN). Based on the game results
we obtain the coupling demand constraints of electricity and natural gas (CD-CENs) which reflect the relationship between the amounts and prices of electricity and cooling (E&C) that DESs purchase from utility networks. Furthermore
the minimization of conflicting costs of E&G networks considering the CDCENs are solved by a multi-objective optimization method. A case study is conducted on a test IES composed of a 20-node natural gas network
a modified IEEE 30-bus system
and 3 DENs
which verifies the effectiveness of the proposed HMOGTA to realize fair treatment for all participants in the IES.