为应对区间流量不确定性造成的梯级水电发电风险,构建了一种基于条件风险价值(conditional value at risk
CVaR)的梯级水电短期调度模型。该模型以梯级水电站为调度单位,利用CVaR模型评估区间径流量不确定性给安全调度带来的风险;在模型中精细化构建了库容水位约束、泄流量尾水位约束、水电机组出力约束,使模型更贴近工程实际应用。针对梯级水电优化调度模型中存在的非线性约束,采用分段线性化、平面投影法分别对一元函数约束、二元函数约束进行线性化,将原模型转化为混合整数线性规划模型,通过成熟商业求解器GUROBI进行求解。通过西南地区某流域两座梯级水电站的模拟仿真,验证了所提方法及模型的可行性与合理性。
To deal with the cascade hydropower generation risks caused by the uncertainty of inflow
a short-term dispatching model based on conditional value-at-risk (CVaR) is proposed
in which each cascade hydropower station is treated as a dispatching unit
and the CVaR approach is employed to evaluate the risks posed by the uncertainty of inflow on secure scheduling. The model incorporates refined constraints
including reservoir water level constraints
tailwater level constraints related to spill volumes
and output constraints for hydropower units
which makes it more closed to practical engineering applications. To handle the nonlinear constraints in the cascade hydropower optimization dispatching model
piecewise linearization and plane projection methods are applied to linearize univariate and bivariate function constraints
transforming the original model into a mixed-integer linear programming (MILP) model
which is then solved using the commercial solver GUROBI. A case study of two cascade hydropower stations in a river basin in Southwest China is carried out
and the results of simulation and analysis validate the feasibility and rationality of the proposed method and model.
刘尚东.基于机器学习耦合模型的渭河流域径流预测研究[D].长安大学,2022(06).
Zhao Zhipeng,Cheng ChunTian,Yan Lingzhi.An efficient and accurate Mixed‐integer linear programming model for long‐term operations of large‐scale hydropower systems[J].IET Renewable Power Generation,2021.
Martello, Silvano.Decision Making under Uncertainty in Electricity Markets[J].The Journal of the Operational Research Society,2015.
Li, X.,Li, T.,Wei, J.,Wang, G.Hydro Unit Commitment via Mixed Integer Linear Programming: A Case Study of the Three Gorges Project, China[J].IEEE Transactions on Power Systems: A Publication of the Power Engineering Society,2014.
Bo Tong,Qiaozhu Zhai,Xiaohong Guan.An MILP Based Formulation for Short-Term Hydro Generation Scheduling With Analysis of the Linearization Effects on Solution Feasibility[J].IEEE Transactions on Power Systems,2013.
Conejo A.J.,Arroyo J.M.,Contreras J.,Villamor F.A..Self-scheduling of a hydro producer in a pool-based electricity market[J].IEEE Transactions on Power Systems: A Publication of the Power Engineering Society,2002.
陈观福,汪新槐.碳中和背景下全球水电发展态势与中国角色[J].水力发电学报,2024(04).
徐冬梅,廖安栋,王文川.基于VMD-EEMD-CNN-LSTM混合模型的月径流预测[J].水利规划与设计,2023(07).
王秀杰,王玲,滕振敏,田福昌,袁佩贤,苑希民.VMD-PSO-LSTM模型的日径流多步预测[J].水利水运工程学报,2023(04).
洪敏,艾萍,岳兆新.基于FPA-ELM模型的中长期径流预测——以雅砻江流域为例[J].人民长江,2022(06).
马芳平,罗玮,钟青祥,金峰,张明君.大型流域梯级电站群智能调度关键技术研究及实践[J].电工电能新技术,2022(04).
张甲甲,万定生.基于混合GA优化LSTM的中小流域流量预测研究[J].计算机仿真,2022(02).
马宇航,黄媛,刘俊勇,路亮.考虑日内来水不确定和电网断面约束的梯级水电日前调度[J].电力建设,2020(09).
申建建,张秀飞,王健,程春田,李秀峰.求解水电站日负荷优化分配的混合整数非线性规划模型[J].电力系统自动化,2018(19).
王健,程春田,申建建,武新宇,曹瑞.水电站群优化调度非线性全局优化方法[J].中国电机工程学报,2018(17).
苏承国,王沛霖,武新宇,程春田,王嘉阳.考虑机组组合的梯级水电站短期调峰MILP模型[J].电网技术,2018(06).
纪昌明,李荣波,田开华,张验科,李传刚.基于来水不确定性的梯级水电站负荷调整耦合模型——以锦官电源组梯级水电站为例[J].水利学报,2017(01).
周建中,袁柳,卢鹏,乔祺,莫莉,王超.水情变化条件下梯级水电站实时负荷调整方法[J].水力发电学报,2015(09).
刘红岭,蒋传文,张焰.基于随机规划的水电站中长期合约电量优化策略[J].中国电机工程学报,2010(13).