ZHANG Gui-min, SUN Wen-qing, ZHU Ze-fan, et al. Influence of construction gap on the force of steel lining
in compressed air storage cavern[J]. 2026, 47(2): 485-496.
ZHANG Gui-min, SUN Wen-qing, ZHU Ze-fan, et al. Influence of construction gap on the force of steel lining
in compressed air storage cavern[J]. 2026, 47(2): 485-496.DOI: 10.16285/j.rsm.2025.0645.
there will be construction gaps between the steel lining and concrete lining of the compressed gas energy storage artificial chamber
which brings great risks to the stability and tightness of the artificial chamber. In order to study the influence of construction gaps on the force of the steel lining of the compressed gas energy storage artificial chamber
a theoretical analysis method was proposed to simplify the concrete lining-surrounding rock double-layer cylinder model into a single-cylinder model with equivalent characterization parameters. An analytical model is developed to characterize the stress distribution in steel linings before and after gap closure. Its effectiveness is verified by numerical simulation. Based on the equivalent theoretical model
the sensitivity analysis of different parameters such as air pressure
elastic modulus of surrounding rock
cohesion of surrounding rock
friction angle of surrounding rock and burial depth is carried out. Analytical solutions for the stress in the steel lining under varying parameter conditions were obtained for both before and after the closure of the construction gap. The hoop-prestress ratio in the steel lining under various parameter settings was determined prior to the closure of the construction gap. The results indicate that the width of the construction gap is the key factor influencing the steel lining’s prestress. A larger gap leads to a greater proportion of hoop prestress and a higher hoop stress after the gap closes during gas injection. Furthermore
the internal air pressure
the elastic modulus of the surrounding rock
its cohesion
and the burial depth of the cavern significantly influence the mechanical response of the steel lining. By contrast
the friction angle of the surrounding rock exerts only a minor effect. During construction
the gap width must be strictly controlled. Furthermore
priority should be given to sites exhibiting a high elastic modulus of the surrounding rock
high rock cohesion
and greater burial depth during the site selection phase. The maximum gas storage pressure must be maintained within the permissible limit. Together
these measures underpin the gas storage facility’s long-term operational safety.