1. 兰州交通大学 土木工程学院,甘肃,兰州,730070
2. 西南交通大学 土木工程学院,四川,成都,610031
网络首发:2025-12-20,
纸质出版:2025
移动端阅览
马学宁, 王乐, 白帆, 等. 既有−新建并排组合桩板墙嵌固段桩前被动土拱效应研究[J]. 岩土力学, 2025,46(12):3899-3912.
MA Xue-ning, WANG Le, BAI Fan, et al. Passive soil arching effect in front of piles in embedded section of existing-new side-by-side composite pile-sheet wall[J]. 2025, 46(12): 3899-3912.
马学宁, 王乐, 白帆, 等. 既有−新建并排组合桩板墙嵌固段桩前被动土拱效应研究[J]. 岩土力学, 2025,46(12):3899-3912. DOI: 10.16285/j.rsm.2025.0005.
MA Xue-ning, WANG Le, BAI Fan, et al. Passive soil arching effect in front of piles in embedded section of existing-new side-by-side composite pile-sheet wall[J]. 2025, 46(12): 3899-3912. DOI: 10.16285/j.rsm.2025.0005.
以中兰客专引入兰州枢纽工程的组合桩板墙为研究对象,采用现场监测与数值模拟相结合的方法,对既有−新建并排组合桩板墙嵌固段桩前被动土拱效应进行系统研究。通过现场监测获取新桩桩身变形、弯矩及桩前接触土压力等关键参数,并建立三维有限元模型进行对比验证。基于数值模拟结果,深入分析了组合桩板墙桩前被动土拱的形成机制、演化规律、几何特征及空间形态。研究表明:既有桩和新桩的桩前接触土压力呈上大下小的抛物线分布,在帮填路堤和列车荷载作用下,既有桩桩前接触土压力增量小于新桩;随新增荷载的增加,两桩桩身位移增大,与桩间土体产生显著位移差,导致桩间土体主应力方向偏转,在既有桩和新桩间形成桩前被动土拱;被动土拱演化过程分为以下几个阶段:既有路堤荷载作用下,既有桩前形成稳定土拱;新桩桩孔开挖应力释放范围有限,既有桩前土拱仍存在;随新增荷载的增大,新桩和既有桩桩前土体应力出现重合区,导致应力重分布;既有桩前原有土拱消失,在新桩与既有桩间逐渐重构形成新的被动土拱。路堤帮宽前后,随荷载的增加,被动土拱厚度基本恒定,但矢跨比逐渐增大;相同工况下,土拱厚度和矢跨比随埋深增加而减小。研究成果可为新型组合桩板墙的设计与施工提供参考。
This study uses the composite pile-sheet wall introduced into the Lanzhou hub project by the Zhongwei–Lanzhou passenger dedicated line as the research object
and employs a combined field monitoring and numerical simulation approach to systematically investigate the passive soil-arch effect in front of piles in the embedded section of the existing–new side-by-side pile-sheet wall. Field monitoring yields measurements of pile deformation
bending moment
and soil pressure in front of the new pile
and a three-dimensional finite element (FE) model is constructed for comparative verification. Based on the numerical simulation results
an in-depth analysis is conducted of the formation mechanism
evolution
geometric characteristics
and spatial configuration of the passive soil arch in front of the composite pile-sheet wall. The results show that the contact soil pressure in front of both the existing and the new piles follows a parabolic distribution
with larger values near the surface and smaller values at depth. Under embankment widening and train loading
the increase in contact soil pressure in front of the existing piles is smaller than that in front of the new piles. As the loads on the new pile increase
both piles experience greater displacements
creating a substantial displacement difference with the soil between them. This causes the principal-stress direction in the inter-pile soil to deviate and leads to the formation of a passive soil arch in front of both the existing and the new piles. The evolution of the passive soil arch can be divided into the following stages. Under the load from the existing embankment
a stable soil arch forms in front of the existing pile. The stress relief caused by excavating the new pile holes is limited in extent
and the soil arch in front of the existing piles remains intact. With the increase of new load
the stress of the soil in front of the new and the existing piles overlaps
resulting in stress redistribution. The original soil arch in front of the existing pile disappears
and a new passive soil arch forms progressively between the new and existing piles. Before and after the embankment widening
as the load increases
the thickness of the passive soil arch remains relatively constant
but the rise-span ratio gradually increases. Under the same working conditions
the soil arch thickness and the rise-span ratio decrease with increasing burial depth. The research results can provide reference for the design and construction of new composite pile-sheet wall.
0