YE Kun, LI Zhao-jun, CHEN Peng-fei, et al. Calculation of asymmetric straight piles for bridge pile foundation and application of supplement pile construction[J]. 2025, 46(4): 1278-1285.
YE Kun, LI Zhao-jun, CHEN Peng-fei, et al. Calculation of asymmetric straight piles for bridge pile foundation and application of supplement pile construction[J]. 2025, 46(4): 1278-1285.DOI: 10.16285/j.rsm.2024.0862.
The use of supplement piles is a common remedial measure in bridge construction. The resulting asymmetric pile foundation is calculated according to current highway specifications
which is not closed and unstable. A calculation method for asymmetric straight piles is proposed based on the m-method. Firstly
calculate the stiffness of a single pile and summarize the pile group stiffness at the base of the pile cap. Then establish a balance equation related to the longitudinal and transverse directions. The load at the base of the pile cap is recombined according to the asymmetric structure
and the displacement of the pile cap is determined by solving the equilibrium equation. Next
calculate the external force at the top of each pile in sequence. Then
carry out subsequent calculations according to the current specifications
and finally achieve the calculation of asymmetric pile foundation. It has been verified that this method is accurate
efficient
and easy to operate
making it suitable for inclusion in specifications. Practical engineering applications have demonstrated that the approach of using supplement piles around the bearing platform is structurally sound and straightforward to implement. In case of damage to a side pile
two symmetrically placed piles should be added adjacent to the affected side of the pile cap; for a corner pile damage
one pile should be added at each end of the pile cap; if the middle pile is damaged
one pile should be added to the closest side of the pile cap. To save costs
one pile can be damaged and replaced within a range of 1-2 times the diameter of the abandoned pile. However
as it does not meet the minimum pile spacing requirement