DENG Dong-ping, YANG Chun-hui, XIE Zhi-jun. M-P method for analyzing the long-term stability of slope reinforced by pre-stressed cables under the nonlinear M-C strength criterion[J]. 2024, 45(4): 1051-1066.
DENG Dong-ping, YANG Chun-hui, XIE Zhi-jun. M-P method for analyzing the long-term stability of slope reinforced by pre-stressed cables under the nonlinear M-C strength criterion[J]. 2024, 45(4): 1051-1066.DOI: 10.16285/j.rsm.2023.0635.
Expanding the applicability of traditional limit equilibrium (LE) methods in slope stability analysis under complex conditions has been a research hotspot in geotechnical engineering field. It is recognized that the shear failure of geotechnical body of slope is typically governed by nonlinear strength criteria
while the traditional LE method is only applicable to the slope stability analysis under the linear strength criterion. Pre-stressed anchors
as an active protection measure
are widely used in the reinforcement of medium and large-scale slope projects because they can greatly and instantly improve the stability of slopes. However
the long-term stability characteristics of slope reinforced by the pre-stressed cables
including stress relaxation
creep
and the effects of corrosion
are often overlooked. To address these issues
an approach based on the Morgenstern-Price (M-P) has been developed. This method incorporates the nonlinear Mohr-Coulomb (M-C) criterion and integrates the pre-stress loss model of the cables under stress relaxation and creep effects
as well as the performance deterioration model of the cables under the influence of corrosion. In order to tackle the challenge of solving implicit nested formulas under the nonlinear strength criterion
the initial value of the inter-slice normal force is set to zero
and an iterative loop calculation strategy is applied. Subsequently
the approximation of the real theoretical results of slope stability can be realized by introducing the criterion of the allowable error of loop termination. Through comparison and analysis of various examples
the feasibility and rationality of this method have been verified. Furthermore
the variation patterns of long-term stability of slope reinforced by the pre-stressed cables under different pre-stressed loss rates and different corrosion environments are also studied.