YUAN Wei, LIU Shang-ge, NIE Qing-ke, et al. An approach for determining the critical thickness of the karst cave roof at the bottom of socketed pile based on punch failure mode[J]. 2019, 40(7): 2789-2798.
YUAN Wei, LIU Shang-ge, NIE Qing-ke, et al. An approach for determining the critical thickness of the karst cave roof at the bottom of socketed pile based on punch failure mode[J]. 2019, 40(7): 2789-2798.DOI: 10.16285/j.rsm.2018.1635.
The thickness of karst cave roof at the bottom of socketed pile is a significant influence factor on the vertical bearing capacity of the pile. In practice
related engineering standardizations in China request that the thickness of karst cave roof should not be less than 3 times of the pile diameter. Obviously
this method determining the thickness of karst cave roof based on engineering standardizations is empirical and non-specific without consideration of rock-mass quality and karst cave’s size. In this paper
based on punch failure mode of rock mass around the tip of the pile
we develop an approach to determine the critical thickness-diameter ratio of karst cave roof (
the ratio of karst cave roof’s thickness to pile’s diameter) through generalized Hoek-Brown failure criterion and limit analysis method. In addition
the suggested values of critical thickness-diameter ratio for different classifies quality of engineering rock mass are also supplied. The results show that the ultimate tip resistance
hardness degree of rock and rock-mass quality have significant influence on the critical thickness-diameter ratio. The smaller the ultimate resistance
the better the rockmass quality and the harder the rock
the smaller critical thickness-diameter ratio. Besides
this paper suggests that the critical thickness-diameter ratio for the rock-mass with I~IV quality levels are: for I level