CHENG Li, LIU Yao-ru, PAN Yuan-wei, et al. Research on ultimate bearing capacity of Jinping-I Arch Dam based on impoundment period inversion[J]. 2016, 37(5): 1388-1398.
CHENG Li, LIU Yao-ru, PAN Yuan-wei, et al. Research on ultimate bearing capacity of Jinping-I Arch Dam based on impoundment period inversion[J]. 2016, 37(5): 1388-1398.DOI: 10.16285/j.rsm.2016.05.022.
It is known that Jinping-I arch dam is the highest arch dam in the world with a height of 305 m. However
the dam foundation lithology is quite poor due to f5
f8 and other faults exposed on the construction base layer. In addition
the foundation is highly asymmetric. Hence
the evaluation of the ultimate bearing capacity of Jinping-I arch dam cannot reach an agreement due to the geological complexity. Based on the deformation reinforcement theory and 3D nonlinear FEM program T-FINE
the concrete elastic modulus and dam foundation deformation modulus during impounding period are inverted using a direct method and values of the forward inverted plumb monitoring stations. Moreover
the validity and feasibility of the inversion parameters are verified in the impoundment period prediction and the ultimate bearing capacity analysis. The stress and displacement of dam body under normal conditions are simulated with the inversion parameters. Based on project analogy method
the ultimate bearing capacity of Jinping-I arch dam is evaluated completely
considering the yield zones
unbalanced force
plastic complementary energy norm
safety factors and other indexes. The reliability of design parameters is also verified by comparing the calculated results of inversion parameters and design parameters. The results show that K1 (the safety factor when crack initiating) of Jinping–I arch dam is double overload while K3 (the safety factor for ultimate load) is 8 times overload. Hence
it is confirmed that Jinping–I arch dam has a higher ultimate bearing capacity than other arch dams in 300 m height and thus the whole stability is guaranteed.