With the introduction of rainwater discharge outlets into the scope of pollutant discharge permit management
industrial enterprises pay more and more attention to the initial rainwater collection and management. By combing
comparing and analyzing the requirements of initial rainwater in relevant standards
the industrial enterprises that need to collect initial rainwater are identified from the perspective of possible pollution and the project industry. By comparing various calculation methods of initial rainwater and combining with the fundamental purpose of initial rainwater management
the selection principles of calculation methods of initial rainwater collection are more clearly and specifically given
and the selection of initial rainwater collection range
rainfall duration and rainfall thickness parameters is refined. Put forward suggestions on the time requirements for initial rainwater collection and post-treatment; From the perspective of the enterprise
the specific guidance on early intervention
daily management and effect evaluation in the initial rainwater collection and management is put forward. From the perspective of the environmental protection department
the supervision suggestions on rainfall period
non rainfall period and the self-monitoring data of the rainwater inlet are put forward; So as to make the initial rainwater collection and management more operable and the daily supervision of the initial rainwater more targeted.
Performance and implementation of low impact development – A review[J]. Kyle Eckart;Zach McPhee;Tirupati Bolisetti.Science of the Total Environment,2017
Best management practices (BMPs) site selection for reducing urban surface runoff at target locations[J]. Rashidi Mehrabadi Mohammad Hossein;Saghafian Bahram;Bazargan Lari Mohammad Reza.DESALINATION AND WATER TREATMENT,2017