The work of the fuel department is very important as a share of coal combustion in the cost of thermal power plants is extremely high
at about 70%-80% of total expenditure. According to the national standards of the People’s Republic of China
the compilation of the latest test methods for electric power coal sets out in detail the standards and procedures for coal quality inspection in thermal power plants. Coal quality inspection is mainly divided into sampling
sample making
testing three chunks
the respective proportion of error is sampling 80%
sample making 16%
testing 4%. The laboratory is the least represented
but testing is the last procedure in the whole inspection process
which is of great significance. This article mainly aims at the laboratory aspect
starts from the personnel and the instrument
reasonably distributes the personnel division of labor
formulates the equipment maintenance measure
the innovation technology level
minimizes the test human error and the instrument error.