中电投江西核电有限公司
纸质出版:2017
移动端阅览
[1]李俊,冯成,陈田.简析核电新建项目许可证申请管理[J].能源研究与管理,2017(01):12-14+21.
李俊, 冯成, 陈田. Analysis of New Nuclear Power Plant License Application Management[J]. 2017, (1): 12-14+21.
[1]李俊,冯成,陈田.简析核电新建项目许可证申请管理[J].能源研究与管理,2017(01):12-14+21. DOI: 10.16056/j.1005-7676.2017.01.004.
李俊, 冯成, 陈田. Analysis of New Nuclear Power Plant License Application Management[J]. 2017, (1): 12-14+21. DOI: 10.16056/j.1005-7676.2017.01.004.
核电厂从前期筹备到开工依次经历厂址普选、初可研、可研和建造许可证申请4个阶段。期间完成各阶段的外委专题和支持性文件
并通过相关部门审批是项目开工建设的先决条件。通过对核电新建项目许可证申请的工作依据、文件准备和审批流程等内容进行梳理
并对管理思路和相关经验进行总结
旨在探索出一套行之有效的方法为后续核电项目的许可证申请提供借鉴和参考。
From pre-construction to the first concrete date(FCD)
nuclear power plant experiences four stages of site general election
preliminary feasibility investigation
feasibility investigation and construction permit license application. The completion of monographic study and supporting documents
and approval by the relevant departments is a prerequisite for FCD. Analysis of the working basis
documents preparation and approval process of license application
exploring a set of effective management ideas for new projects.
核电厂初步可行性研究报告内容深度规定[S].2010.
核电厂可行性研究报告内容深度规定[S].2010.
朱文辉.新建核电项目核准阶段执照申请管理实践[J].中国管理信息化,2015(02).
李铁志.核电项目前期执照申请管理的探索与实践[J].中国科技信息,2011(15).
0
浏览量
59
下载量
2
CSCD
关联资源
相关文章
相关作者
相关机构