The problems of remote channel interruption or error rate in power system integrated automation increased. The common processes of handling simulation signal failure were introduced in this pape. Combining with an example
the causes of the problem were analyzed and estimated. The fault location was determined timely and the fault time was reduced. The experience for commumication maintenance in power systems was provided.