分析了浙能长兴电厂机组对外供热现状及存在的问题
探讨了提升机组供热能力的2种方式
经过比较选择了冷再直接减压方式
改造投资省、系统结构简单、运行灵活
有效地提高了供热的安全和可靠性
实施后增加了供热量
经济和社会效益好。
The status quo and existing problems of Zhejiang Changxing Power Plant unit external heating is analyzed
and discusses how to improve the heating capacity of the unit in two ways
through the comparison and selection of the cold again direct decompression
the transformation of investment
system has the advantages of simple structure
flexible operation
effectively improves the safety and reliability of the heating
after the implementation of the increase in the quantity of heat
and a good economic and social benefits.