In accordance with the higher requirements of the company intends
Liaoning Dongfang Power Plant to implement unit startup and shutdown control system
referred to as APS. The actual situation through the function of APS
comprehensive analysis and case of domestic successful power plant and combined with Liaoning Dongfang Power Plant 350 MW unit were discussed accordingly
from the equipment
logic
design are discussed and compared
and put forward the corresponding views and opinions
should pay attention to in the implementation of the problems and direction. The implementation of APS is feasible
and the basis of local framework also needs to pay attention to the actual implementation and its rationality.