熊辉, 权星军. Analysis and Optimization of Ultra-supercritical Units with No Electric Feed Pump Start Up Process[J]. 2015, (1): 82-85. DOI: 10.16056/j.1005-7676.2015.01.023.
超超临界机组无电动给水泵启机过程分析及优化
摘要
为实现公司扭亏为盈目标
同时为简化机组启动过程运行操作
提出景德镇发电厂2×660 MW超超临界机组冷态、热态启动过程由原电动给水泵供水转变为汽泵供水
讨论无电泵启机过程分析及优化
并对启动过程中的相关试验及特点进行了分析说明。
Abstract
To achieve the company’s profitability targets
as well as to simplify running operation of start-up process
made in cold
hot start process of Jingdezhen power plant 2×660 MW ultra-supercritical units procedure by the original electric pump the water into steam to pump water
analysis and optimization of no pump start up process was discussed
and relevant tests and characteristics of start process were analyzed and explained.