阎仲旭. Do it Right the First Time and Continued Ascent in Application of Nuclear Power Project Quality Management[J]. 2015, (1): 5-9. DOI: 10.16056/j.1005-7676.2015.01.002.
一次做对与持续提升在核电项目质量管理中的应用
摘要
从大型核电工程项目基本特征入手
分析影响大型核电工程项目质量的各种因素
引出项目质量管理概念
并结合项目质量管理特点
分析一次做对与持续提升在核电项目质量管理中的实际应用。同时
阐明了如何以质量管理计划为龙头
并通过质量计划的编制、实施、检查与调整、总结4个阶段的循环
确保项目工期
降低项目成本
顺利实现项目质量管理总目标。
Abstract
This article starts with the basic characteristics of large nuclear power project
analysis of various factors affecting the quality of large-scale nuclear power project
which leads to the project quality management concept
and combining with the characteristics of project quality management
and to analyze doing it right the first time and continued ascent in the nuclear power project quality management in the practical application. At the same time
it expounds how to take the quality management plan as a leader
and through the quality planning
implementation of the quality plan
quality plan of inspection and adjustment
quality plan summary of the four stages of the cycle