Liu Wu, Li Shan, Huang Jianfeng, et al. The Current Status of Conventional Conductor Fixing Technologies and Equipment Development for Distribution Network Overhead Lines[J]. Rural Electrification, 2026, (7): 51-53, 80.
Liu Wu, Li Shan, Huang Jianfeng, et al. The Current Status of Conventional Conductor Fixing Technologies and Equipment Development for Distribution Network Overhead Lines[J]. Rural Electrification, 2026, (7): 51-53, 80.DOI: 10.13882/j.cnki.ncdqh.2603F025.
To address the difficulties caused by dense end nodes and restricted working spaces in elevated sections
this paper proposes a terminal fixing device with dual protection consisting of a screw clamp and an elastic rope
and establishes a torque-angle calibration procedure to achieve standardized tightening and self-locking. The results show that the technical solution proposed in this study reduces the single installation time from 12.4 minutes to 3.7 minutes
decreases the cycle time by 70%
and improves the reliability from 94.6 to 99.8. The tension fluctuation is controlled within the specified ±10 supervisory limit
and the temperature rise of the outer shell meets the requirements of the national standard.