CAO JIN, XING LU. Case Analysis of a False Trip Alarm During a 35 kV BZT Cold Load Transfer Operation[J]. Rural Electrification, 2026, (5): 77-80.DOI: 10.13882/j.cnki.ncdqh.2603A008.
The D6000 centralized control system frequently generates false alarms during cross-station correlated operations
stemming from the inherent limitations of its single-station logic. Taking a false alarm event caused by a 35 kV Backup Automatic Transfer (BZT) cold load transfer operation as an example
this paper analyzes the defects of event-based alarm logic in non-fault automatic switching scenarios. The study finds that
due to the lack of identification of source side operation behavior
the signal combination generated by the BZT action
namely "switch position change
general accident signal
and protection trip"
satisfies the conventional accident criteria
leading to system misjudgment. To address this problem
this paper proposes introducing the nature of source side operations as a blocking condition and constructing cross station topological correlation constraints to resolve such false alarms
thereby providing a reference for wide area logic optimization in centralized control systems.
KEZUNOVIC M.Intelligent alarm processing: From data to information[J].IEEE Power and Energy Magazine,2009,7(2):25-34.
WEN L,XIE X,LI K,et al.Power System Fault Diagnosis Based on Temporal Logic and Alarm Information[J].IEEE Transactions on Power Delivery,2019,34(3):1025-1036.