Current power secondary equipment management still relies on manual experience
facing challenges such as underutilized defect records
overly complex workflows
and management redundancy. There is an urgent need to introduce defect knowledge reuse and query tools for management and front-line maintenance personnel. Based on the management process of power secondary equipment
this paper sorts out the information of each stage
constructs a power secondary equipment management system based on knowledge graph
and conducts application case analysis and data evaluation.
CERNY T,DONAHOO M J,TRNKA M.Contextual understanding of microservice architecture: current and future directions[J].ACM SIGAPP Applied Computing Review,2018,17(4):29-45.
[VILLAMIZAR M,GARCÉS O,CASTRO H,et al.Evaluating the monolithic and the microservice architecture pattern to deploy web applications in the cloud[C]//10th Computing Colombian Conference (10CCC),2015.583-590.
[VERNON V.Implementing Domain-Driven Design[M].Association for Computing Machinery,2022.
LIU F-H F,WANG P-h.DEA Malmquist productivity measure: Taiwanese semiconductor companies[J].International Journal of Production Economics,2008,112(1):367-379.