KE Cuigan, LUO Jinhua, LIU Shuangshuang, et al. Shallow geohazard evaluation method based on 3D seismic: A case study of a deep-water work area in the South China Sea[J]. Petroleum Reservoir Evaluation and Development, 2021, (5): 716-723.
KE Cuigan, LUO Jinhua, LIU Shuangshuang, et al. Shallow geohazard evaluation method based on 3D seismic: A case study of a deep-water work area in the South China Sea[J]. Petroleum Reservoir Evaluation and Development, 2021, (5): 716-723. DOI: 10.13809/j.cnki.cn32-1825/te.2021.05.008.
The offshore oil and gas exploration is gradually advancing deeper. Meanwhile
the South China Sea has great potential for deep-water oil and gas resources. Generally
for the deep water exploration
the project scale is large
the requirements of the project management are high
and the investigation is difficult. Due to the factors such as the changeable marine climate environment
the relatively complex geological environment
the professional survey vessels or survey equipment
and the high requirement of underwater positioning accuracy
the commissioned technical requirements
project capital cost and operation safety risk in the deep water survey area are significantly higher than those in the shallow area. In a deep-water work area in the South China Sea
the seabed picking up
well pass section
maximum negative amplitude and seismic slice of the 3 D seismic data are used to evaluate the bathymetry
seabed topography
shallow strata
faults
amplitude anomalies and other investigation contents of the work area
so as to carry out the disaster prediction and safety assessment of the shallow geological conditions to guide the emplacement
installation and production of the underwater engineering facilities system in the target oil and gas mining area.Based on the 3 D seismic data
a relatively simple and practical method for geological hazard assessment in shallow layer of the deep water is explored. As a part of the desktop research stage in the whole life cycle of EPCI(Engineering
Procurement
Construction and Installation)
this method provides necessary support for the smooth development of the project plan.