LIU Junkang, TAO Qian, SHEN Wei, et al. Application of low residual strain elastic ductile cement slurry system for shale gas wells in southern Pingqiao block[J]. Petroleum Reservoir Evaluation and Development, 2020, 10(1): 90-95.
LIU Junkang, TAO Qian, SHEN Wei, et al. Application of low residual strain elastic ductile cement slurry system for shale gas wells in southern Pingqiao block[J]. Petroleum Reservoir Evaluation and Development, 2020, 10(1): 90-95. DOI: 10.13809/j.cnki.cn32-1825/te.2020.01.014.
In the early stage of shale gas block in southern Pingqiao
the annular pressure phenomenon of casing production existed in high pressure shale gas wells
so that the elastic and ductile cement slurry system is optimized to improve the cementing quality and improve the long-term sealing ability of cement ring. Comprehensive analysis for the reason of this phenomenon is made
and through the physical simulation device
the sealing ability evaluation experiment of cement ring is carried out to reveal it. By interphase filling technology
the brittleness of cement is improved. Meanwhile
nano-emulsion filling technology is used to realize void filling and reduce porosity of cement and micro-ring gap. After the optimization of cement slurry system
the elastic modulus of cement slurry and the residual strain of cement slurry are reduced more than 10 % and 30 % respectively. As for as the field application of 6 wells in site
the cementing quality rate is 100 %
and the casing annulus pressure phenomenon has not happened yet. The application of low residual strain elastic ductile cement slurry system provides new technical method and means for shale gas wells to prevent annulus zone pressure
which have a good reference significance and popularization value.