1. 西南石油大学油气藏地质及开发工程国家重点实验室,四川,成都,610500
2. 中国石油塔里木油田分公司油气工程研究院,新疆,库尔勒,841000
[ "罗志锋(1980 —),男,博士,副教授,从事油气藏动态及增产改造理论与技术研究。通讯地址:四川省成都市新都区新都大道8号,邮政编码:610500。E-mail: lzf03429@163.com" ]
纸质出版:2019
移动端阅览
罗志锋, 吴林, 赵立强, 等. 纤维暂堵转向酸压工艺设计方法与应用[J]. 油气藏评价与开发, 2019,9(6):65-71.
Zhifeng LUO, Lin WU, Liqiang ZHAO, et al. Design method and application of temporary plugging by fiber and diverting acid fracturing[J]. Petroleum Reservoir Evaluation and Development, 2019, 9(6): 65-71.
罗志锋, 吴林, 赵立强, 等. 纤维暂堵转向酸压工艺设计方法与应用[J]. 油气藏评价与开发, 2019,9(6):65-71. DOI: 10.13809/j.cnki.cn32-1825/te.2019.06.012.
Zhifeng LUO, Lin WU, Liqiang ZHAO, et al. Design method and application of temporary plugging by fiber and diverting acid fracturing[J]. Petroleum Reservoir Evaluation and Development, 2019, 9(6): 65-71. DOI: 10.13809/j.cnki.cn32-1825/te.2019.06.012.
针对纤维暂堵转向酸压纤维用量定量化设计难的问题
建立了考虑初次人工裂缝、邻井人工裂缝、孔隙压力变化、温度变化及原地应力的总应力场模型。进行多元非线性回归
建立了转向半径的预测模型。采用位移不连续法(DDM)等进行求解
并结合纤维封堵机理
建立了纤维用量设计模型。模拟结果表明
初次人工裂缝在最小主应力方向上的诱导应力值更大
邻井人工裂缝、孔隙压力变化、温度变化对应力转向的影响较小。原地应力差越小
初次人工裂缝越长
井距越小
裂缝内净压力越大转向越容易
转向半径越大。当原地应力差较大时
有必要采用纤维暂堵的方式以提高缝内净压力
纤维用量可根据纤维用量设计模型确定。将上述设计应用于新疆M井
设计结果与现场施工结果基本接近
新裂缝转向成功。
In order to solve the problem of quantitative design of fiber in fiber temporary plugging and diverting acid fracturing
a total stress field model considering the initial artificial fracture
adjacent well artificial fracture
pore pressure change
temperature change and in-situ stress is established. And then the prediction model of diverting radius is established by multivariate nonlinear regression. Meanwhile
methods such as the displacement discontinuity method(DDM) are used to solve the model
and combined with the fiber plugging mechanism
the design model of fiber dosage is established. The simulation results show that the induced stress value of the initial artificial fracture in the direction of minimum principal stress is larger
and the influence of artificial fracture of adjacent well or wells
pore pressure variation and temperature variation on stress diverting are small. The smaller the original in-situ stress difference
the longer the initial artificial fracture length
the smaller the well spacing
the larger the net pressure in the fracture
and the larger the diverting radius. When the in-situ stress difference is large
it is necessary to use the temporary plugging of fiber to increase the net pressure of the fractures
and the fiber dosage can be determined according to the design plate. Applying the above design method to a well in Xinjiang
the results were basically close to the on-site construction results