Chen Jianhua, Chu Peng, Wang Laichao, et al. Calculation and application of bottom hole pressure buildup during shut-in period in high temperature and high pressure offshore gas well[J]. Petroleum Reservoir Evaluation and Development, 2018, (2): 41-46.
Chen Jianhua, Chu Peng, Wang Laichao, et al. Calculation and application of bottom hole pressure buildup during shut-in period in high temperature and high pressure offshore gas well[J]. Petroleum Reservoir Evaluation and Development, 2018, (2): 41-46. DOI: 10.13809/j.cnki.cn32-1825/te.2018.02.007.
The calculation of the bottom hole pressure(BHP)in the high temperature and high pressure the gas wells with should consider the temperature changes inside the wellbore. The coupling of the pressure and temperature need to be solved simultaneously. The current calculation methods considering the wellbore heat transfer
and the coupling of pressure and temperature mainly apply to the steady flow. However
they don’t apply to the transition flow during the shut-in period. Meanwhile
the wellbore heat transmission of the offshore gas well in high temperature and high pressure should consider the effects of sea water. Nevertheless
there are fewer examples of this research. According to the problems above and based on the basic equation
we established a new calculation model
which considers wellbore storage
and the heat transfer among the wellbore
adjacent formation and sea water.This method is successfully applied to the BHP calculation and well testing analysis for the well M1 during the shut-in period in M gas field of the western South China Sea
thus providing the basis for the temperature and pressure calculation and well testing optimization of high temperature and high pressure offshore gas well.