Aiming at the lack of peak regulation capacity of power system with high proportion of offshore wind power
a “source-grid-load-storage” scheduling optimization model is designed.Through the analysis and prediction of historical wind data
the peak regulation of power generation side
power grid side and load side in the energy storage station cooperative system is configured.The simulation results show that the “source-grid-load-storage” scheduling optimization model can improve the overall scheduling intensity and frequency of the power system
improve the consumption level of offshore wind turbines
and reduce the operating cost of the entire system.