In order to comprehensively summarizes the problems existing in the current power grid planning under the territorial space planning system
analyzes the new management and control requirements for the layout of power facilities in the data base
index system and space control of the land space planning
and puts forward the land space planning system.Under the territorial space planning system
the five core contents of the power facility layout plan are“goal setting”“demand setting”“layout point setting”“space setting”and“requirement setting”.And put forward the technical transformation of electric facilities layout planning in four aspects:unified planning basis
planning connection and transmission
spatial layout requirements and planning evaluation feedback.