赖信, 林舜江, 梁宇涛, 等. 海上风电机组和集电网络的协调规划方法[J]. 高电压技术, 2025,51(6):2819-2829.
LAI Xin, LIN Shunjiang, LIANG Yutao, et al. Coordinated Planning Approach for Offshore Wind Farm Turbines and Collection Networks[J]. 2025, 51(6): 2819-2829.
赖信, 林舜江, 梁宇涛, 等. 海上风电机组和集电网络的协调规划方法[J]. 高电压技术, 2025,51(6):2819-2829. DOI: 10.13336/j.1003-6520.hve.20241763.
LAI Xin, LIN Shunjiang, LIANG Yutao, et al. Coordinated Planning Approach for Offshore Wind Farm Turbines and Collection Networks[J]. 2025, 51(6): 2819-2829. DOI: 10.13336/j.1003-6520.hve.20241763.
为了合理对海上风电场(offshore wind farm
OWF)进行规划,提高OWF投资和运行的经济性,需要对海上风电机组和集电网络的规划进行研究。针对采用交流并网方式的OWF集电系统,建立了一个以最大化OWF集电系统年期望利润为目标的海上风电机组和集电网络协调优化规划模型,决策变量为风电机组的位置和容量、集电网络的电压等级和拓扑连接、集电线路的容量、海上升压平台的位置和变压器容量。模型中采用考虑区域风向的尾流效应模型来准确反映不同风电机组间尾流的影响。为求解协调规划模型,采用Benders分解法将原混合整数非线性规划模型分解为混合整数线性规划模型的主问题和二次规划模型的子问题,通过交替迭代求解以高效获得最优协调规划方案,并提出了采用折线处理海缆交叉的方法以提高模型的求解效率。最后,对2个装机容量分别为200 MW和1 000 MW的实际OWFs算例进行分析,结果表明:与集中式求解等方法相比,所提方法具有更高的求解效率,且所得OWF规划方案具有更高的经济性和可靠性。
In order to rationally plan offshore wind farm(OWF) and improve the economics of OWF investment and operation
it is necessary to study the planning of offshore wind farm turbines and collection networks. For the OWF collection system using AC grid-connected mode
a coordinated optimization planning model of wind turbines(WTs) and collection network is established with the goal of maximizing the annual expected profit of the OWF collection system. Meanwhile
the decision variables are the WTs' locations and capacities
the voltage level and topological connection of the collection network
the collection cable capacities
the locations of the offshore platforms and the transformer capacities. In the model
the wake effect model considering regional wind directions is used to accurately reflect the wake effect between different WTs. In order to solve the coordinated planning model
by using the Benders decomposition method
the original mixed integer nonlinear programming model is decomposed into the master problem of mixed integer linear programming model and the sub-problem of quadratic programming model; moreover
the optimal coordinated planning scheme is efficiently obtained through alternative iteration solution
and a method of using polyline to handle cross submarine cables is proposed to improve the efficiency of model solution. Finally
two practical OWFs with installed capacity of 200 MW and 1 000 MW are analyzed. The results show that
compared with the centralized solution and other methods
the proposed method has higher solution efficiency
and the obtained OWF planning scheme has higher economy and reliability.