刘有为, 1, 2, 等. 电化学储能机组过电压、绝缘配合及耐压试验[J]. 电网技术, 2025,49(10):4406-4415.
LIU Youwei, 1, 2, et al. Over Voltage, Insulation Coordination, and Insulation Withstand Tests for Electrochemical Energy Storage Unit[J]. 2025, 49(10): 4406-4415.
刘有为, 1, 2, 等. 电化学储能机组过电压、绝缘配合及耐压试验[J]. 电网技术, 2025,49(10):4406-4415. DOI: 10.13335/j.1000-3673.pst.2024.1413.
LIU Youwei, 1, 2, et al. Over Voltage, Insulation Coordination, and Insulation Withstand Tests for Electrochemical Energy Storage Unit[J]. 2025, 49(10): 4406-4415. DOI: 10.13335/j.1000-3673.pst.2024.1413.
电化学储能(electrochemical energy storage,EES)机组不同于传统高压设备,差异主要有两点,一为有源设备,二为积木式结构,如直挂35kV EES机组,单相约有25~50个子模块,过电压在EES机组内的传播与分布、EES机组的过电压保护方案、绝缘配合及绝缘耐压试验都有新的特征。该文以29个子模块级联后直挂交流35kV的EES机组为例,计算分析了雷电冲击、标准操作冲击、陡波及长波操作冲击下EES机组的过电压分布,包括主回路极对地过电压分布及沿子模块链的纵向过电压分布。文中根据承担电压的特征,将EES机组绝缘分为对地绝缘和纵绝缘(相邻部件间的绝缘)。结果显示,雷电冲击主要作用于极对地绝缘。为了限制EES机组极对地绝缘的雷电过电压幅值,至少需两组避雷器,一组安装在母线,另一组安装在EES机组的交流高压出线。通过合理配置避雷器,各子模块极对地的最大雷电过电压幅值基本相同,只是发生频次有所差异,靠近电网一侧的频次更高。操作冲击下极对地过电压低于雷电冲击,但会在EES机组的纵绝缘上产生过电压,子模块两极间过电压可达稳态电压峰值的1.6倍左右,并产生大约5kA的过电流。最后,文中针对EES机组提出了由子模块代替EES机组整机进行绝缘耐压试验的理论依据和方法,并基于高斯分布给出了EES机组绝缘配合因数的确定原则。该文提出的EES机组雷电过电压保护方案、绝缘配合因数及绝缘耐压试验方法可作为EES机组绝缘设计及绝缘安全实证的重要参考。
Electrochemical energy storage (EES) unit is different from traditional high-voltage equipment in two main characteristics: active and modular structure
such as a direct connected to 35kV EES unit
which has about 25-50 submodules in a single phase. There are new features in the overvoltage propagation and distribution within EES units
the overvoltage protection scheme
the insulation coordination
and the insulation withstand tests of EES unit. This article takes the EES unit with 29 submodule cascaded direct connecting to AC 35kV as an example to calculate and analyze the overvoltage distribution inside the EES unit under lightning impulse
standard operating impulse
steep wave and long wave operating impulse
including the distribution of overvoltage to ground in the main circuit and the longitudinal overvoltage distribution along the submodule chain. According to the characteristics of withstand overvoltage
the insulation of EES units is divided into pole to ground insulation and longitudinal insulation (the insulation between adjacent components) in the paper. The results show that lightning impulse mainly acts on the pole to ground insulation. To limit the lightning overvoltage amplitude of the EES unit's pole to ground insulation
at least 2 sets of lightning arresters are required
one set installed on the busbar and the other set installed on the EES unit side of the grid connected reactor (see Figure 3). By properly configuring lightning arresters
the maximum amplitudes of lightning overvoltage between each submodule and ground are basically the same
but the frequency of occurrence varies
with higher frequency on the side closer to the power grid. The overvoltage of the pole to the ground caused by operating impulse is lower than that caused by lightning impulse
but it will generate overvoltage on the longitudinal insulation of the EES unit. The overvoltage between the two poles of the submodule can reach about 1.6 times the peak of the steady-state voltage and generate roughly 5kA overcurrent. Finally
the article proposes a theoretical basis and method for conducting insulation withstand tests on EES unit using submodules instead of the entire EES unit and provides a principle for determining the insulation coordination coefficient of EES unit based on Gaussian distribution. The overvoltage protection scheme
insulation coordination coefficients
and insulation withstand test methods proposed in this article can serve as important references for EES unit insulation design and insulation safety demonstration.