Optimization Configuration Method of Electric-thermal Hybrid Energy Storage for Desert-Gobi-Wasteland Renewable Energy Bases Considering the Transformation of Decommissioned Thermal Power Units Into Carnot Battery
LIU Tianyang, SHU Yinbiao, BI Tianshu, et al. Optimization Configuration Method of Electric-thermal Hybrid Energy Storage for Desert-Gobi-Wasteland Renewable Energy Bases Considering the Transformation of Decommissioned Thermal Power Units Into Carnot Battery[J]. 2026, 46(15): 6135-6147.
LIU Tianyang, SHU Yinbiao, BI Tianshu, et al. Optimization Configuration Method of Electric-thermal Hybrid Energy Storage for Desert-Gobi-Wasteland Renewable Energy Bases Considering the Transformation of Decommissioned Thermal Power Units Into Carnot Battery[J]. 2026, 46(15): 6135-6147.DOI: 10.13334/j.0258-8013.pcsee.250615.
“双碳”目标提出以来,我国加快以沙漠、戈壁、荒漠地区为重点的大型风光基地建设。为提升新能源消纳能力,该文提出一种考虑退役火电改造卡诺电池(Carnot battery,CB)的沙戈荒新能源基地(Desert-Gobi-Wasteland renewable energy base,DGW-REB)电热混合储能(electric-thermal hybrid energy storage,ETHES)优化配置方法。首先,面向含电化学储能和卡诺电池的沙戈荒新能源基地,分析退役火电改造熔盐卡诺电池的基本原理,构建熔盐卡诺电池经济技术特性模型。其次,以基地年净收益最大为目标,建立计及绿证-碳交易机制的沙戈荒新能源基地电热混合储能规划运行一体化模型,基于时间维度分解的全年8 760 h时序生产模拟进行求解。最后,以我国库布齐沙漠某新能源基地为例开展仿真分析,验证所提方法可支撑大规模高比例新能源外送。研究结果可为沙戈荒新能源基地储能优化配置提供理论参考。
Abstract
Since the proposal of the “dual carbon” target
China has accelerated the construction of large-scale renewable energy bases in desert
Gobi and wasteland regions. To improve renewable energy accommodation capacity
this paper proposes an optimization configuration method of electric-thermal hybrid energy storage(ETHES) for Desert-Gobi-Wasteland renewable energy base (DGW-REB) considering the transformation of decommissioned thermal power units into Carnot battery (CB). Primarily
the basic principle of the transformation of decommissioned thermal power units into molten salt CB is analyzed for DGW-REB including electrochemical energy storage and CB
and a model for the economic and technical characteristics of molten salt CB is constructed. Secondly
targeting the maximization of annual net income of DGW-REB and considering the green certificate-carbon trading mechanism
an integrated planning and operation model of ETHES for DGW-REB is established and solved by annual 8 760 h time-series production simulation based on time dimension decomposition. Finally
simulation analyses are carried out by taking a practical renewable energy base example in the Kubuqi Desert as the engineering case. The results verify that the proposed method can support large-scale and high-proportion renewable energy power delivery. The research findings can provide a theoretical reference for the optimization configuration of energy storage of DGW-REB.