SHI Ruiyan,ZHAO Yongning,FU Kunming,et al.Ultra-Short-Term Load Forecasting Considering Historical Data Missing and Load Temporal Heterogeneity[J].Electric Power Construction,2026,47(06):123-136.
SHI Ruiyan,ZHAO Yongning,FU Kunming,et al.Ultra-Short-Term Load Forecasting Considering Historical Data Missing and Load Temporal Heterogeneity[J].Electric Power Construction,2026,47(06):123-136.DOI: 10.12204/j.issn.1000-7229.2026.06.010.