唐江, 王学栋, 赵玉柱, 等. 凝汽机组高背压供热改造后的性能指标与调峰能力分析[J]. 发电技术, 2018,39(5):455-461.
Jiang TANG, Xuedong WANG, Yuzhu ZHAO, et al. Analysis of Performance Indicators and Peak Regulation Capacity of Condensing Unit After High Back Pressure Retrofit for Heating[J]. Power Generation Technology, 2018, 39(5): 455-461.
唐江, 王学栋, 赵玉柱, 等. 凝汽机组高背压供热改造后的性能指标与调峰能力分析[J]. 发电技术, 2018,39(5):455-461. DOI: 10.12096/j.2096-4528.pgt.2018.070.
Jiang TANG, Xuedong WANG, Yuzhu ZHAO, et al. Analysis of Performance Indicators and Peak Regulation Capacity of Condensing Unit After High Back Pressure Retrofit for Heating[J]. Power Generation Technology, 2018, 39(5): 455-461. DOI: 10.12096/j.2096-4528.pgt.2018.070.
介绍了135 MW、300 MW等级凝汽机组高背压供热改造技术,由机组改后的性能试验,得到机组高背压运行的性能指标,高背压纯凝工况下的热耗率为3 690~3 740 kJ/(kW·h),高背压抽汽工况下的热耗率在3 690~4 060 kJ/(kW·h)之间。并分析了改造技术、冷端设计参数与运行参数对机组性能指标的影响,同样135 MW等级机组,满负荷工况下,循环水流量差3 500 t/h,凝汽器背压差15 kPa,机组额定工况下的发电功率差26.7 MW。由机组供热期调峰能力试验,确定机组高背压运行的调峰区间和调峰适应性,300 MW机组的调峰能力为65 MW,为改造前额定容量的22%;而135 MW等级机组的调峰能力为35~60 MW,为改造前额定容量的26%~44%。并分析了造成机组调峰区间变窄、调峰适应性降低的原因。
The article explains the heating supply technology retrofit for 135 MW and 300 MW grade units at high back pressure condition. The performance indicators of high back pressure operational conditions are obtained through performance test after retrofit. At high back pressure operational mode
the heat consumption rate of pure condensing condition is among 3690~3740 kJ/(kW·h)
the heat consumption rate of extraction steam condition is among 3690~4060 kJ/(kW·h). The effect of retrofit technology
cold end design parameters and operational parameters on performance indicators has been analyzed. For the same 135 MW grade unit
under full load condition
the difference of circulating water being 3500 t/h
the difference of condenser pressure is 15 kPa. The difference of generator power at full condition is 26.7 MW. By peak regulation capacity test during heat supply period
the peak regulation range and adaptation with high back pressure operational mode have been determined. The power load regulation capacity of 300 MW unit is 65 MW
being 22% of rated capacity before retrofit. The power load regulation capacity of 135 MW unit is 35~60 MW
being 26%~44% of rated capacity before retrofit. The reason that resulting peak regulation range narrow and peak regulation decrease also have been analyzed.
考芳.小型凝汽式汽轮机低真空运行循环水供热改造[J].山东电力技术, 2010, 137(3):46-48.
郑杰.汽轮机低真空运行循环水供热技术应用[J].节能技术, 2006, (4):380-382.
王晓红, 孙超.凝汽器低真空供热经济性分析[J].华电技术, 2009, 31(1):37-39.
张秀琨, 郑刚, 刘传威, 等.抽凝机组低真空循环水供热技术分析与应用[J].上海电力学院学报, 2009, 25(6):543-546.
高炜, 蒋建平, 王宏伟.汽轮机高背压改造在火电机组的应用[J].山东电力技术, 2013, 40(1):59-61.
韩中合, 肖炜刚, 安国银.大型汽轮机供热改造方案研究[J].汽轮机技术, 2016, 58(3):198-200.
王学栋, 王德华, 郑威, 等.150MW机组高背压供热改造的试验研究与分析[J].汽轮机技术, 2012, 54(5):397-400.
成渫畏, 王学栋, 郝玉振.140MW机组双背压双转子互换供热改造技术分析[J].发电与空调, 2013, 34(3):5-8.
杨添皓, 刘建清, 栗东升.150 MW汽轮机供热增容改造方案分析[J].内蒙古电力技术, 2017, 35(3):61-65.
成渫畏, 王学栋, 宋昂.首台300MW汽轮机循环水供热改造技术与经济指标分析[J].发电与空调, 2016, 37(1):6-10.
石德静, 姜维军.300MW汽轮机高背压循环水供热技术研究及应用[J].山东电力技术[J]. 2015, 42(4):8-11.
0
浏览量
0
下载量
0
CSCD
关联资源
相关文章
相关作者
相关机构
京公网安备11010802024621