广东工业大学 自动化学院,广东,广州,510006
蔡伟聪(1999–),男,硕士研究生,主要研究方向为电力系统优化运行与规划,E-mail:2112204010@mail2.gdut.edu.cn
彭显刚(1964–),男,教授,硕士生导师,主要研究方向为电力系统优化运行与规划,E-mail:epxg@gdut.edu.cn
纸质出版:2025
移动端阅览
蔡伟聪, 彭显刚, 褚卓卓, 等. 计及可靠性的配电网“源−网−荷−储”协调规划[J]. 广东工业大学学报, 2025, 42(5): 68–76.
Cai Weicong, Peng Xiangang, Chu Zhuozhuo, et al. Joint Planning Technology of Source-Network-Load-Storage in Distribution Network Considering Reliability[J]. 2025, 42(5): 68-76.
蔡伟聪, 彭显刚, 褚卓卓, 等. 计及可靠性的配电网“源−网−荷−储”协调规划[J]. 广东工业大学学报, 2025, 42(5): 68–76. DOI: 10.12052/gdutxb.240125
Cai Weicong, Peng Xiangang, Chu Zhuozhuo, et al. Joint Planning Technology of Source-Network-Load-Storage in Distribution Network Considering Reliability[J]. 2025, 42(5): 68-76. DOI: 10.12052/gdutxb.240125.
分布式光伏的大规模接入给配电网的经济性和可靠性带来了挑战,本文提出一种考虑可靠性的“源−网−荷−储”协调规划方法。首先建立考虑可靠性的“源−网−荷−储”双层协调规划模型,上层以经济成本最小化和可靠性收益最大化为目标函数,下层以运行成本和电压偏移量最小化为目标函数,通过加权系数法将上下层的多目标问题转化为单目标问题,模型考虑了功率平衡约束、潮流约束、系统容量约束等约束条件。针对该模型,采用纵横交叉算法和gurobi求解器进行联合求解。最后通过IEEE33节点系统进行仿真分析,验证所提方法的有效性和实用性。结果表明,考虑可靠性的“源−网−荷−储”协调规划模型能够在确保经济性的同时有效提高可靠性和改善电压质量。
The large-scale integration of distributed photovoltaics poses challenges to the economy and reliability of the distribution network. To address this
a coordinated planning approach of "source-grid-load-storage" considering reliability has been proposed. Firstly
a bi-level coordination planning model of "source-network-charge-storage" with reliability is established. The upper-level is established to minimize the cost and maximize the revenue of reliability
and the lower-level is established to minimize the cost of operation and voltage quality. The weighted coefficient method is used to transform the multi-objective into a single-objective in the upper and lower level. And the model considers constraints such as power balance
power flow
and configuration capacity of system. Next
Crisscross optimization algorithm is used to solve the model with gurobi solver jointly. Finally
IEEE 33-node system is utilized to verify the effectiveness and practicality of the proposed method. The results show that the joint planning model of "source-network-load-storage" which considers the reliability can minimize the cost while improve the reliability and voltage quality.
CHENG Y H, ZHANG N, WANG Y, et al . Modeling carbon emission flow in multiple energy systems[J ] . IEEE Transactions on Smart Grid, 2019, 10(4): 3562-3574.
ZHAO W, XIONG Z Y, PAN Y, et al . Low-carbon planning of power system considering carbon emission flow[J ] . Automation of Electric Power Systems, 2023, 47(9): 23-33.
SUN Y S, YANG M, SHI C L, et al . Analysis of application status and development trend of energy storage[J ] . High Voltage Engineering., 2020, 46(1): 80-89.
CHEN C Q, LI X R, ZHANG B Y, et al . Research on multi-stage optical storage coordination planning considering load dynamic characteristics[J ] . Acta Energiae Solaris Sinica, 2022, 43(6): 8-16.
LI Y, FENG B, WANG B, et al . Joint planning of distributed generations and energy storage in active distribution networks: a Bi-Level programming approach[J ] . Energy, 2022, 245: 123226.
LIU J S, LUO N, WANG J, et al . Massive scenario reduction based distribution-level power system planning considering the coordination of source, network, load and storage[J ] . Electric Power, 2022, 55(12): 78-85.
ZHANG Z H, LEI D Y, LI J, et al . Source-network-load-storage bi-level collaborative planning model of active distribution network with SOP based on adaptive ε -dominating multi-objective particle swarm optimization algorithm [J ] . Power System Technology, 2022, 46(6): 2199-2209.
ZHENG J Y, XUAN J Q, YI C Y, et al . “Source-grid-load-storage” coordinated planning of active distribution network considering electric vehicle charging station[J ] . Engineering Journal of Wuhan University, 2023, 56(1): 9-19.
ZHOU B R, HUANG T C, ZHANG Y J. Reliability analysis on microgrid considering incentive demand response[J]. Automation of Electric Power Systems, 2017, 41(13): 70-78.
DING J, MA C L, CHEN X L, et al . Reliability evaluation of active distribution network considering “Supply-Grid-Load”[J ] . Power System and Clean Energy, 2020, 36(3): 18-26.
HOU M Q, NIU Q F, XING J, et al . Optimal configuration of energy storage system in active distribution network with the consideration of reliability[J ] . Energy Storage Science and Technology, 2023, 12(2): 504-514.
LI Z K, LI Y J, ZHANG D H, et al . Influence analysis of energy storage device on reliability of distribution network and its optimal allocation[J ] . Power System Technology., 2018, 42(11): 3676-3683.
MA T X, DUAN X, LU Z G, et al . Optimal siting and sizing method of wind storage power station in regional power grid considering power supply reliability assessment[J ] . Smart Power, 2021, 49(7): 36-43.
GE S Y, SUN H, LIU H, et al . Power supply capability evaluation of active distribution network considering reliability and post-fault load response[J ] . Automation of Electric Power Systems, 2019, 43(6): 77-84.
GUO Y F, OUYANG S, ZHANG J M, et al . Assessment of critical load and optimization configuration method for small hydropower distribution network with integrated Hydro-PV-energy storage[J ] . Guangdong Electric Power, 2024, 37(5): 32-42.
SUN C, WANG L J, XU H L. An interaction load model and its application in microgrid day-ahead economic scheduling[J]. Power System Technology. 2016, 40(7): 2009-2015.
LIU Z F, YU P Y, LI J Y. Planning of distributed generation and generalized energy storage in distribution network considering operation characteristics[J]. Electric Power Automation Equipment, 2023, 43(3): 72-79.
MENG A, CHEN Y, YIN H, et al . Crisscross optimization algorithm and its application[J ] . Knowledge-Based Systems, 2014, 67: 218-229.
REN Z J, GUO H X, YANG P, et al . Double-layer optimal configuration of flexible resources with high proportion of renewable energy distribution network[J ] . Acta Energiae Solaris Sinica, 2021, 42(9): 33-38.
0
浏览量
0
下载量
0
CSCD
关联资源
相关文章
相关作者
相关机构
京公网安备11010802024621