鲍一凡, 刘攀, 张玮, et al. Attaining water balance between the Three Gorges and Gezhouba reservoirs based on head loss coefficient correction[J]. Journal of Hydroelectric Engineering, 2025, 44(12).
鲍一凡, 刘攀, 张玮, et al. Attaining water balance between the Three Gorges and Gezhouba reservoirs based on head loss coefficient correction[J]. Journal of Hydroelectric Engineering, 2025, 44(12). DOI: 10.11660/slfdxb.20251203.
a significant imbalance has occurred for decades long in the upstream and downstream flows of the Three Gorges reservoir and Gezhouba reservoir
severely affecting the practices of flow forecasting
reservoir operation
and power production. After examining the inflow and outflow on different scales
we find that this imbalance is caused by the errors in the previous calculations of power generation flows
and the underlying cause is the poor calculation method of head loss around the Gezhouba dam. This paper develops a novel head loss model for achieving the water balance of the two reservoirs. We adopt the latest unit characteristic curves and the Shuffled Complex Evolution Algorithm in our calibration of the head loss coefficients for each generating unit
and apply the corrected loss coefficients to the calculations of power generation flows
achieving satisfactory water balance results. For the whole year of 2024
or the verification period
our calculations reduce the water volume gap from 11.52 billion m3 to 0.16 billion m3
and correct the previous average head loss of 28.31 cm to a new smaller value of 6.27 cm. Thus
this study significantly reduces water imbalance in cascade reservoirs caused by power generation flow calculation errors.