方青青, 王国强, 张尚弘, et al. Study on mechanism of water transfer project impacting on macrobenthos community based on water exchange capacity[J]. Journal of Hydroelectric Engineering, 2024, 43(4).
方青青, 王国强, 张尚弘, et al. Study on mechanism of water transfer project impacting on macrobenthos community based on water exchange capacity[J]. Journal of Hydroelectric Engineering, 2024, 43(4).DOI: 10.11660/slfdxb.20240406.
Changes in the hydrological conditions cause the fluctuation of an aquatic ecosystem
and the operation of a large-scale water transfer project often changes the community structure of aquatic organisms. This study examines the community structure of macrobenthos in Nansi Lake and Dongping Lake before and after the implementation of a water transfer project. The characteristics of water age change caused by the project are simulated and analyzed
and the influence of such large-scale projects on the community of macrobenthos in the lakes is discussed from the perspective of water exchange capacity. The results show that on the annual scale
after the project’s operation for a certain period of time
a change in the macrobenthic community in Dongping Lake occurred from domination by small-size aquatic insects to domination by large-size molluscs
and the dominance of molluscs in Nansi Lake was more prominent. On the seasonal scale
the proportion of molluscs usually was decreased in the water transfer period (non-rainy season)
and increased in the non-water transfer period (rainy season). The implementation and operation of the water transfer project has changed the characteristics of the hydrodynamic field in the lakes
and enhanced the exchange capacity of the water bodies on the annual scale. Superposition of the water transfer inflow and the river runoff into the lake causes a longer time of flows with high velocity in the lake
which was not conducive to the stable growth of small-size species and thus led to a gradual increase in the proportion of large-size molluscs on the annual scale. In addition
the project’s implementation mainly enhanced the water exchange capacity in the non-rainy season
but the capacity in the non-rainy season was still lower
even with an increased water volume being transferred
than that in the rainy season
which also caused a decrease in the proportion of molluscs in the rainy season and an increase in the non-rainy season before and after the implementation of the water transfer project.