1. School of Astronautics, Harbin Institute of Technology,Harbin,China
2. Anhui Usem Technology Co. Ltd.,Wuhu,China
3. School of Energy and Electrical Engineering, Qinghai University,Xining,China
4. Contribution: Investigation, Validation, Visualization
5. Department of Electrical Engineering, College of Engineering in Wadi Alddawasir, Prince Sattam Bin Abdulaziz University, Al-Kharj, Saudi Arabia
6. State Grid Zhejiang Electric Power Co. Ltd. Construction Branch Company,Hangzhou,China
7. Institute of Science and Technology, China Three Gorges Corporation,Beijing,China
8. School of Automation, Wuhan University of Technology,Wuhan,China
纸质出版:2026
移动端阅览
Suxun Zhu, Bowen Ren, Lili Zheng, 等. Multi-Step Ahead Short-Term Load Forecasting Based on MCNN-MMoL[J]. IET Smart Energy Systems, 2026,2(1).
Suxun Zhu, Bowen Ren, Lili Zheng, et al. Multi-Step Ahead Short-Term Load Forecasting Based on MCNN-MMoL[J]. IET Smart Energy Systems, 2026, 2(1).
Suxun Zhu, Bowen Ren, Lili Zheng, 等. Multi-Step Ahead Short-Term Load Forecasting Based on MCNN-MMoL[J]. IET Smart Energy Systems, 2026,2(1). DOI: 10.1049/ses2.70020.
Suxun Zhu, Bowen Ren, Lili Zheng, et al. Multi-Step Ahead Short-Term Load Forecasting Based on MCNN-MMoL[J]. IET Smart Energy Systems, 2026, 2(1). DOI: 10.1049/ses2.70020.
Multi-step ahead forecasting of power load is crucial for optimising power system scheduling and participating in energy market transactions. However
existing forecasting methods often suffer from issues such as cumulative prediction errors and insufficient modelling of sequence dependencies. To solve the above problems
a multi-step ahead forecasting method based on multiplexed convolutional neural networks (MCNN) and multi-gate mixture of long short-term memory networks (MMoL). First
multi-branch convolution is adopted to construct independent feature spaces for different levels of power loads
achieving multi-scale feature fusion to enhance the representation ability of the input samples. Next
the multi-step prediction task is transformed into a multi-task joint optimisation problem. Multiple independent LSTMs are used as shared experts
and task-specific gating units are utilised to dynamically learn the optimal combination of expert models for each future time step
achieving more refined time-series feature modelling. Finally
comparative experiments are conducted based on two real-world datasets. The results show that the proposed model exhibits better accuracy and robustness.
0
浏览量
0
下载量
0
CSCD
关联资源
相关文章
相关作者
相关机构
京公网安备11010802024621