1. Department of Electrical Engineering, Shanghai Jiao Tong University,Shanghai,China
2. Electric Power Research Institute of Guangdong Power Grid Co. Ltd,Guangzhou,China
纸质出版:2025
移动端阅览
Si Chen, Gehao Sheng, Yingting Luo, 等. Fast Calculation of Transformer Hot Spot Temperature Based on Winding Equivalent Thermal Parameters[J]. 高电压(英文), 2025,10(5).
Si Chen, Gehao Sheng, Yingting Luo, et al. Fast Calculation of Transformer Hot Spot Temperature Based on Winding Equivalent Thermal Parameters[J]. High Voltage, 2025, 10(5).
Si Chen, Gehao Sheng, Yingting Luo, 等. Fast Calculation of Transformer Hot Spot Temperature Based on Winding Equivalent Thermal Parameters[J]. 高电压(英文), 2025,10(5). DOI: 10.1049/hve2.70107.
Si Chen, Gehao Sheng, Yingting Luo, et al. Fast Calculation of Transformer Hot Spot Temperature Based on Winding Equivalent Thermal Parameters[J]. High Voltage, 2025, 10(5). DOI: 10.1049/hve2.70107.
The hot spot temperature of a transformer is one of the critical indicators reflecting its operating status. Accurate and fast calculation of hot spot temperature is significant for the online monitoring of transformers. Considering the low computational efficiency of the transformer’s numerical full model (FM)
this paper presents a model simplification method based on the equivalent thermal parameters of windings to expedite hot spot temperature computation. Initially
the representative volume element (RVE) reflecting the periodic structure of windings is selected to formulate a reduced model (RM) for the transformer. Subsequently
to achieve equivalence between the RM and the FM
the equivalent thermal parameters of the RVE are calculated
containing the equivalent thermal conductivity (ETC)
the equivalent density (ED)
and the equivalent specific heat capacity (ESHC). Finally
the validity of the RM is verified by the temperature rise test. The results show that
compared with the tested data
the maximum error of the hot spot temperature calculated by the RM is 2.56 K
demonstrating the accuracy of the hot spot temperature calculation by the RM. Compared with the FM
the computing time of the proposed RM is reduced to 1/189
which significantly improves the computational efficiency.
The hot spot temperature of a transformer is one of the critical indicators reflecting its operating status. Accurate and fast calculation of hot spot temperature is significant for the online monitoring of transformers. Considering the low computational efficiency of the transformer’s numerical full model (FM)
this paper presents a model simplification method based on the equivalent thermal parameters of windings to expedite hot spot temperature computation. Initially
the representative volume element (RVE) reflecting the periodic structure of windings is selected to formulate a reduced model (RM) for the transformer. Subsequently
to achieve equivalence between the RM and the FM
the equivalent thermal parameters of the RVE are calculated
containing the equivalent thermal conductivity (ETC)
the equivalent density (ED)
and the equivalent specific heat capacity (ESHC). Finally
the validity of the RM is verified by the temperature rise test. The results show that
compared with the tested data
the maximum error of the hot spot temperature calculated by the RM is 2.56 K
demonstrating the accuracy of the hot spot temperature calculation by the RM. Compared with the FM
the computing time of the proposed RM is reduced to 1/189
which significantly improves the computational efficiency.
0
浏览量
0
下载量
0
CSCD
关联资源
相关文章
相关作者
相关机构
京公网安备11010802024621