Chao Lu, Yang Jiang, Di Liu, 等. Successful Field Testing of the World's First Buoyant Megawatt-Scale High-Altitude Wind Energy System[J]. Energy Internet, 2026,3(1).
Chao Lu, Yang Jiang, Di Liu, et al. Successful Field Testing of the World's First Buoyant Megawatt-Scale High-Altitude Wind Energy System[J]. Energy Internet, 2026, 3(1).
Chao Lu, Yang Jiang, Di Liu, 等. Successful Field Testing of the World's First Buoyant Megawatt-Scale High-Altitude Wind Energy System[J]. Energy Internet, 2026,3(1). DOI: 10.1049/ein2.70024.
Chao Lu, Yang Jiang, Di Liu, et al. Successful Field Testing of the World's First Buoyant Megawatt-Scale High-Altitude Wind Energy System[J]. Energy Internet, 2026, 3(1). DOI: 10.1049/ein2.70024.
Successful Field Testing of the World's First Buoyant Megawatt-Scale High-Altitude Wind Energy System
摘要
In September 2025
the world's first buoyant megawatt-scale high-altitude wind energy system (HAWES) successfully completed its initial field deployment and structural validation in Hami
China. The prototype is a buoyant aerostat operating at 1500 m
equipped with 12 turbine-generators to harness the stronger and more consistent winds found at that altitude. The HAWES concept offers compelling advantages: higher wind-power density allows for significantly lighter components (1.16 tonnes vs. over 10 tonnes for conventional turbines)
whereas steadier winds improve the capacity factor
benefiting grid integration. Key technical challenges for the system include the design of a deeply integrated
lightweight electrical topology and the management of wind speed heterogeneity caused by the aerostat's operational tilt. To validate its core functionality
the system's power generation capability was evaluated through off-grid load tests conducted in a PSCAD/EMTDC simulation environment. The simulation
which successfully modelled the nonuniform wind conditions
confirmed the design's feasibility by demonstrating a stable start-up process and a steady-state power output of 1.135 MW.
Abstract
In September 2025
the world's first buoyant megawatt-scale high-altitude wind energy system (HAWES) successfully completed its initial field deployment and structural validation in Hami
China. The prototype is a buoyant aerostat operating at 1500 m
equipped with 12 turbine-generators to harness the stronger and more consistent winds found at that altitude. The HAWES concept offers compelling advantages: higher wind-power density allows for significantly lighter components (1.16 tonnes vs. over 10 tonnes for conventional turbines)
whereas steadier winds improve the capacity factor
benefiting grid integration. Key technical challenges for the system include the design of a deeply integrated
lightweight electrical topology and the management of wind speed heterogeneity caused by the aerostat's operational tilt. To validate its core functionality
the system's power generation capability was evaluated through off-grid load tests conducted in a PSCAD/EMTDC simulation environment. The simulation
which successfully modelled the nonuniform wind conditions
confirmed the design's feasibility by demonstrating a stable start-up process and a steady-state power output of 1.135 MW.
Singular Perturbation and Complex Torque Analyses of Doubly Fed Induction Generator With Additional Inertia Control
Energy Equity-Aware Load Shedding Optimisation Methodology
相关作者
Qi Guo
Jiawei Yu
Hongsheng Xu
Meng Zhan
Min Cheng
Xin Fang
相关机构
State Key Laboratory of HVDC (Electric Power Research Institute, Guangdong Provincial Key Laboratory of Intelligent Operation and Control for New Energy Power System, CSG Key Laboratory for Power System Simulation (Electric Power Research Institute, China Southern Power Grid), National Energy Power Grid Technology R&D Centre, China Southern Power Grid)
Contribution: Visualization, Supervision
Contribution: Validation, Data curation
State Key Laboratory of Advanced Electromagnetic Engineering and Technology School of Electrical and Electronic Engineering, Huazhong University of Science and Technology