Modeling and control of automatic voltage regulation for a hydropower plant using advanced model predictive control[J]. 全球能源互联网(英文), 2025,8(2).
Ebunle Akupan Rene, Willy Stephen Tounsi Fokui. Modeling and control of automatic voltage regulation for a hydropower plant using advanced model predictive control[J]. Global energy interconnection, 2025, 8(2).
Modeling and control of automatic voltage regulation for a hydropower plant using advanced model predictive control[J]. 全球能源互联网(英文), 2025,8(2). DOI: 10.1016/j.gloei.2024.12.003.
Ebunle Akupan Rene, Willy Stephen Tounsi Fokui. Modeling and control of automatic voltage regulation for a hydropower plant using advanced model predictive control[J]. Global energy interconnection, 2025, 8(2). DOI: 10.1016/j.gloei.2024.12.003.
Modeling and control of automatic voltage regulation for a hydropower plant using advanced model predictive control
Fluctuating voltage levels in power grids necessitate automatic voltage regulators(AVRs)to ensure stability.This study examined the modeling and control of AVR in hydroelectric power plants using model predictive control (MPC)
which utilizes an extensive mathematical model of the voltage regulation system to optimize the control actions over a defined prediction horizon.This predictive feature enables MPC to minimize voltage deviations while accounting for operational constraints
thereby improving stability and performance under dynamic conditions.The findings were compared with those derived from an optimal proportional integral derivative (PID) controller designed using the artificial bee colony (ABC) algorithm.Although the ABC-PID method adjusts the PID parameters based on historical data
it may be difficult to adapt to real-time changes in system dynamics under constraints.Comprehensive simulations assessed both frameworks
emphasizing performance metrics such as disturbance rejection
response to load changes
and resilience to uncertainties.The results show that both MPC and ABC-PID methods effectively achieved accurate voltage regulation; however
MPC excelled in controlling overshoot and settling time—recording 0.0%and 0.25 s
respectively.This demonstrates greater robustness compared to conventional control methods that optimize PID parameters based on performance criteria derived from actual system behavior
which exhibited settling times and overshoots exceeding 0.41 s and 5.0%
respectively.The controllers were implemented using MATLAB/Simulink software
indicating a significant advancement for power plant engineers pursuing state-of-the-art automatic voltage regulations.