您当前的位置:
首页 >
文章列表页 >
Accurate time synchronization of power reference station based on BD3 system
Smart Grid | 更新时间:2026-10-08
    • Accurate time synchronization of power reference station based on BD3 system

    • Accurate time synchronization of power reference station based on BD3 system

    • 全球能源互联网(英文)   2023年6卷第3期 页码:334-342
    • DOI:10.1016/j.gloei.2023.06.007    

      中图分类号:
    • 网络首发:2023-06-27,

      纸质出版:2023-06-27

    移动端阅览

  • Ting Zou, Yuchen Huang, Zhanqiang Cheng, 等. Accurate time synchronization of power reference station based on BD3 system[J]. 全球能源互联网(英文), 2023,6(3):334-342. DOI: 10.1016/j.gloei.2023.06.007.

    Ting Zou, Yuchen Huang, Zhanqiang Cheng, et al. Accurate time synchronization of power reference station based on BD3 system[J]. Global Energy Interconnection, 2023, 6(3): 334-342. DOI: 10.1016/j.gloei.2023.06.007.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

浏览量

0

下载量

0

CSCD

文章被引用时,请邮件提醒。
提交
工具集
下载
参考文献导出
分享
收藏
添加至我的专辑

相关文章

Forecasting the average daily and during the hours of maximum electric load based on the data of the average monthly electricity consumption with single and other energy sources
Negative electricity prices in electricity markets: causes, impacts,and response strategies
Research on benefit coordination mechanism in renewable energy multi-energy complementary systems
Resilient adversarial-evolutionary multi-agent intelligence for real-time EV charging and energy trading in renewable-integrated smart grids
Distribution network data asset protection considering multiple topology and multi-dimensional knowledge graph

相关作者

暂无数据

相关机构

暂无数据
0