您当前的位置:
首页 >
文章列表页 >
Underground Plant Factory in a Mine Tunnel – Part 2: Passive Ventilation Integration and Economic Feasibility
更新时间:2026-10-08
    • Underground Plant Factory in a Mine Tunnel – Part 2: Passive Ventilation Integration and Economic Feasibility

    • Underground Plant Factory in a Mine Tunnel – Part 2: Passive Ventilation Integration and Economic Feasibility

    • 能源与人工环境(英文)   2026年7卷第5期 页码:1290-1300
    • DOI:10.1016/j.enbenv.2025.05.002    

      中图分类号:
    • 网络首发:2026-10-31,

      纸质出版:2026

    移动端阅览

  • Akram, Guo, Hu. Underground Plant Factory in a Mine Tunnel – Part 2: Passive Ventilation Integration and Economic Feasibility[J]. 能源与人工环境(英文), 2026,7(5):1290-1300. DOI: 10.1016/j.enbenv.2025.05.002.

    Akram, Guo, Hu. Underground Plant Factory in a Mine Tunnel – Part 2: Passive Ventilation Integration and Economic Feasibility[J]. Energy and Built Environment, 2026, 7(5): 1290-1300. DOI: 10.1016/j.enbenv.2025.05.002.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

浏览量

1

下载量

0

CSCD

文章被引用时,请邮件提醒。
提交
工具集
下载
参考文献导出
分享
收藏
添加至我的专辑

相关文章

Underground plant factory in a mine tunnel – Part 1: Conceptual design and thermal simulation
District heating system assisted by thermochemical sorption heat storage
Temperature and humidity decoupling control based on diagonal matrix and information entropy for spinning air-conditioning
Editorial Board
Solar-powered tri-generation system integrating organic rankine cycle and absorption chiller for passenger trains energy supply

相关作者

暂无数据

相关机构

暂无数据
0