the world’s first high-level layout of steam turbine generator unit in Jinjie power plant is taken as the research object.Due to the influence of the form and characteristics of the unit
the generator to the main transformer needs to be arranged with high sag and long-distance enclosed bus.In the application process
the analysis and research on the technical problems in many fields such as
radiation and heat dissipation
stress stress
should be strengthened
and through the analysis of the weak points
the corresponding countermeasures should be formulated we should take effective measures.