Rate Duration of Switching off 220~750kV Operating Transmission Lines While Setting up Transmission Lines and Overhead Ground Wires in Construction of 500~1500kV Cross Lines
B. P. Piskunov. Rate Duration of Switching off 220~750kV Operating Transmission Lines While Setting up Transmission Lines and Overhead Ground Wires in Construction of 500~1500kV Cross Lines[J]. 1992, (2): 53-54.
B. P. Piskunov. Rate Duration of Switching off 220~750kV Operating Transmission Lines While Setting up Transmission Lines and Overhead Ground Wires in Construction of 500~1500kV Cross Lines[J]. 1992, (2): 53-54.DOI: