Li Jing Xiao Wei Yang Faqing. Operation Condition of High-voltage Disconnecting Switch of 110 kV and above in Sichuan Power Grid[J]. 2007, (5): 47-48.DOI:
四川电网110kV及以上高压隔离开关的运行状况
摘要
通过对110 kV及以上高压隔离开关完善化前后运行状况的分析
指出了完善化后产品在四川电网运行中发现的缺陷并提出了改进建议。
Abstract
After comparing the operation condition of the improved high-voltage disconnecting switch of 110 kV and above with that of the initial one
the defects of the improved switch found in the operation of Sichuan power grid are pointed out