摘要
对湖南电网当前的调峰状况进行了分析
同时预测分析了远景的调峰状况
指出如不注重电网调峰的规划
将更加加剧电网调峰的困境。文中分析了湖南电网建设抽水蓄能电站的可行性、经济性及效益
指出湖南电网发展抽水蓄能电站势在必行、迫在眉睫。
Abstract
The Analysis and forecast to the status of power peak adjustment have been done for Hunan power network. It is pointed out that more difficult status of power peak adjustment will be encounted unless intessive attention on plan is given. The paper describes the construction possibility and economic benefit to developing pumped storage status in Hunan and points out its urgent necessity.