In1. 7. 1995 A misoperation of a breaker in Bai Ma Long Substation was taken place by reason of "one point "instant grounding in the direct circuit. The root source that we found out through simulated test many’ times was the transient current produced by the direct circuit grounded instantly owing to the filter capacitors assembled the power supply supplying all equipments in the substation.