ZHOU Wen-jiang, CHENG Jing. The Installation of BBD3840 Double-In Double-Out Coal Mill[J]. 2004, (6): 33-35.DOI:
BBD双进双出磨煤机安装
摘要
介绍 BBD385 4型双进双出磨煤机结构特点和在株洲电厂的安装情况
重点介绍了该磨煤机主要安装工艺和在安装、调试阶段出现的主要问题及处理方法。
Abstract
The configuration features and installation of a BBD384 0 double-in and double-out coal mill in Zhuzhou Power Plant are introduced in th is paper.The emphasis is focus on the installation technics of the coal mill
as well as the problems and their treating measures occurring in the installation a nd debugging.