铜湾电站属于沅水流域梯级电站
计划于2 0 0 8年全部建成投产。研究表明
铜湾电站通过2回2 2 0 k V线路接入怀化电网是适宜的。
Located in Zhongfa ng county of Huaihua city in Hunan province
Tongwan hydraulic power plant
which b elongs to the sequence of hydraulic power plants in Yuanshui river area
will pu t into operation in 2008. Study shows that connecting Tongwan to Huaihua power g rid via two 220kV power transmission lines is appropriate.