QIU Ying-jun1, HUANG Pi-wei1, YAN Jian-xin2, et al. Sliding pressure operation after modification of steam passagepart of No.3 unit in Jinzhushan power plant[J]. 2007, (4): 16-18.
QIU Ying-jun1, HUANG Pi-wei1, YAN Jian-xin2, et al. Sliding pressure operation after modification of steam passagepart of No.3 unit in Jinzhushan power plant[J]. 2007, (4): 16-18.DOI:
金竹山电厂3号机组通流部分改造后滑压运行试验研究
摘要
对金竹山电厂3号汽轮机组进行通流部分改造后
机组的热经济性有较大的提高。为了对机组的性能有进一步的了解
对机组进行了滑压运行优化调整试验。通过综合分析
找出机组定、滑压运行时最低热耗率对应的最佳经济工况点
为机组在各种负荷下运行方式的经济调度和参数选择提供依据。
Abstract
After modification of steam passage part of No.3 unit in Jinzhushan power plant
the thermal economy performance was improved.In order to improve the economy performance further
sliding pressure optimized adjustment test was carried out.After surveying the operation modes
the optimized economy operation point corresponding to the lowest heat rate was found out
offering reference to economical dispatching and parameters selection under different conditions.