湖南省电力公司凤滩水力发电厂
纸质出版:2010
移动端阅览
[1]蒋忠宪,陈建文.某电厂地下厂房岩锚梁裂缝发展与厂房开挖相关分析[J].湖南电力,2010,30(05):24-25+28.
蒋忠宪, 陈建文. Analysis about crack growth of anchor beam and underground workshop excavation for an electric power plant[J]. 2010, 30(5): 24-25+28.
[1]蒋忠宪,陈建文.某电厂地下厂房岩锚梁裂缝发展与厂房开挖相关分析[J].湖南电力,2010,30(05):24-25+28. DOI:
蒋忠宪, 陈建文. Analysis about crack growth of anchor beam and underground workshop excavation for an electric power plant[J]. 2010, 30(5): 24-25+28. DOI:
针对某电厂地下厂房下游侧岩锚梁6号裂缝性状、产生原因及与厂房开挖相关性进行分析。结合周边建筑物的情况
对裂缝的稳定性、岩锚梁安全性进行分析评价。
The paper mainly analyzes the crack state of No.6 anchor beam of underground workshop downstream
crack cause and workshop excavation relativity.Combined with the condition of peripheral building
the stability of crack and the security of anchor beam is analyzed.
0
浏览量
47
下载量
1
CSCD
关联资源
相关文章
相关作者
相关机构