LI Ning1, ZHANG Ming-min1, JIN Xin2, et al. Reliability assessment meathod of high-speed railway traction power supply system based on power grid node equivalence[J]. 2012, 32(6): 10-14.
LI Ning1, ZHANG Ming-min1, JIN Xin2, et al. Reliability assessment meathod of high-speed railway traction power supply system based on power grid node equivalence[J]. 2012, 32(6): 10-14.DOI:
电网节点等效的高速铁路供电系统可靠性评估方法
摘要
本文依据高速铁路牵引供电系统网络结构特点将其分为多级。针对高铁牵引供电系统可靠性评估
提出一种简化电网结构以提高可靠性计算速度的方法。结合可靠性评估方法
研究高铁牵引供电系统的调度策略。以某省武广高速铁路某段为例进行仿真
通过可靠性分析确定影响高铁牵引供电系统可靠性的关键环节。
Abstract
According to the network structure characteristics of high-speed railway traction power supply system
the network structure is divided into some levels in this paper.Aimed at reliability assessment of high speed railway traction power supply system
a simplified grid structure method is proposed to improved calculation speed of reliability.Combined with reliability assessment method
the scheduling strategy of high-speed railway traction power supply system is studied.Taking a section of Wuhan-Guangzhou high-speed railway as an example
the key link which influences the reliability of high-speed railway traction power supply system is determined through reliability analysis.