LONG Wei-zhi. Application and analysis on P6 software in the infrastructure project of large thermal power plant[J]. 2013, 33(2): 17-19.DOI:
P6软件在大型火电厂基建项目的应用分析
摘要
结合实用经验
阐述在大型火电厂基建工程项目中
如何遵循P6软件项目管理的统一模式
具体进行项目计划编码与流程的定义
并严格计划编制、进度跟踪与数据的传输。利用P6软件对工程进度进行多方位交叉管理
实现工程的实时可控、在控管理
提升管理水平和管理效率。
Abstract
Combing with practical application experience
the article introduces a uniform pattern of P6 project managementon infrastructure projects
the specific definition of the encoding process of the project plan and strict planning
progress tracking and data transmission in large thermal power plants.The multi-directional overlapping management of the project progress is conducted by P6 software.The real-time control and control management of engineering are realized and the management level and efficiency are improved.